Indoors
Add-on
Skip to product information
Waterproofing (Floor Only)
$350.00 SGD
For toilets with waterleaking issues:
- Step 1: Waterproofing will be first be done (0.5 days)
- Step 2: Epoxy pebble overlay (0.5 days).
Reason for the pebble overlay is that when cured, the waterproofing layer will be like glass and very slippery.
No HDB permit is required as no hacking is involved. Only 1-day turnaround for your toilet flooring. There is no need to remove any toilet accessories (e.g. toilet bowl or basin).
- No hacking required
- Amazing anti-slip properties ⭐ ⭐ ⭐
- Value-for-money
- Easy to clean ; 100% no visible joint lines (grout lines)